Verification throughout production

Test Centre

The alloy analysis of incoming raw material is verified in our own test centre. After production, dimensional and conformity checks accompany every shipment.

06 / Production capability

Starting the process at the right point

Quality control is not just the last step; it is a verification process that runs through production, from raw material to shipment.

ALAlloy verification
QCDimensions and conformity
ReportTraceable shipments

Raw materials supplied with an analysis report are re-checked in our own test centre before they go into production, so material properties are verified before production starts.

After production, the profile section, dimensions and project requirements are assessed. For production from a sample, the existing part is analysed using suitable methods.

Process flow

Four controlled steps

Every project follows the same core discipline; technical details are tailored to the profile section, alloy and application.

01

Raw material

The alloy of incoming material is verified.

02

Process

Critical production parameters are monitored.

03

Measurement

Profile dimensions and section conformity are checked.

04

Reporting

Inspection records are completed for shipment.

Technical scope

What we add to your project

AL

Alloy analysis

Raw material properties verified before production.

MM

Dimensional control

Section and project dimensions assessed.

ID

Traceability

Production and shipment records are tracked.

OK

Conformity

Project requirements checked before shipment.

Let's evaluate your project together

Share your technical drawing, sample or application requirements, and we will plan the right production steps with you.

Get in touch